📍 Tel Aviv, Israel·Est. 2018
Buildots logo
Private Company

Buildots

Schedule-grade AI construction-progress platform. Founded 2018 in Tel Aviv, Israel; operates globally. 360° helmet-camera site walks compared against BIM schedule to flag delays and rework risk before they cascade into budget overruns. Trade-specific AI training (drywall, doors, ceilings, MEP, finishes) measures actual percent-complete versus scheduled. Daily PM dashboards integrate with Procore + Primavera P6 for earned-value reporting.

Listen to this lesson

Free preview · first 0:30
0:00 / 0:30

Audio & video lessons are paid features

Plus unlocks audio streaming. Pro adds downloadable audio, video, certificates, and more.

Plus adds:
  • Audio streaming
  • Downloadable PDFs
  • All AI Playbooks
  • Personalized content
Pro also adds:
  • Certificates of completion
  • Audio MP3 downloads
  • Video lessonssoon
  • & More…soon

Watch this lesson

Video coming soon

Learn About Buildots's AI Products

Create a free account to access in-depth lessons on each tool and model.

Start Learning Free

📋About Buildots

Updated June 15, 2026

Buildots is the schedule-grade AI construction-progress platform. Founded in 2018 in Israel and now operating globally, Buildots uses 360° helmet-camera site walks combined with AI-driven progress detection to compare as-built reality against the BIM schedule. The platform flags delays and rework risk before they cascade into budget overruns, giving project managers measurable quantities of completed work versus scheduled work in a daily dashboard. Buildots' positioning relative to OpenSpace is schedule-grade depth. Where OpenSpace emphasizes the navigable visual record and time-stamped capture comparison, Buildots emphasizes measuring exactly how much of each scheduled task is complete — drywall, doors, ceilings, MEP rough-in, finishes — and tying that measurement to the construction schedule. The AI is trained specifically on construction trades and material types; it produces measurable quantities (linear feet, square feet, count of doors) rather than just visual percent-done. Schedule comparison and critical-path delay forecasting let PMs catch slips before they cascade into budget overruns. The output is a daily PM dashboard — what's behind schedule, what's at risk, what changed since last week — replacing subjective superintendent estimates with objective data feeding earned-value reporting in Procore and Primavera P6. Customers include ENR Top 400 contractors and large general contractor groups in the US, Europe, and Asia, though US footprint as of 2026 is smaller than OpenSpace.

🛠️Products & Tools (1)

BuildotsEnterpriseAEC AI

AI-powered construction progress tracking — captures site walks via 360° helmet cameras, then compares as-built reality to the BIM schedule to flag delays and rework risk before they cascade.